Forum quick links
Senior Living Community - Multiple Registrations really needed?
posted by Werner Maassen on
Our project entails an existing Senior Housing and Care Campus in California consisting of 10 buildings. Our client/owner/operator wants to achieve LEED Silver for 6 of the buildings which will be
Existing systems modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Tiffany Moore on
If a project retains existing mechanical systems, but the overall scope of the renovations meets the new construction threshold, are the baseline calcs based on code-minimum or should the project a
Sidewalk clarification
Pilot-Credits PC14:Walkable Streetsposted by Michelle Oishi on
One of the requirements states, "At-grade crossings with driveways account for no more than 10% of the length of sidewalks within the project".
M&V case 2
CI-2009 EAc3:Measurement and Verificationposted by Chris Miller on
CI project, 75% or more of the space is occupied by the tenant, and I have seen the 4/1/12 addenda with the replacement language for Case 2.
Calculating FTE
posted by Nicole Kimoto on
I have 3 shifts in a 24-hour period. In the first shift, I have a total of 410 occupants during first 2 hours of that shift.
Natural ventilation in a Multifamily building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Walter Parks on
We have an apartment building in which we have both mechanical ventilation and natural ventilation.
Calculate Button on Form
CS-2009 WEp1:Water Use Reductionposted by John Riker on
Our MEP has filled in all the information required for WEp1 form, but pressing calculate (on MS Internet Explorer) does not generate any results.
Commercial Office - Rating System selection
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Rohit Jagnani on
I have a client looking for LEED certification of its Commercial offices.
Ground source water loop required District Cooling guidance?
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
We would like to ask something regarding a comment from a reviewer for EAc1, this is a rather vague comment in our view.
EA c1.2 form Space types
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Michael Archer on
I was wondering why the EA c1.2 form doesn't include an option for Private Office under the Space Types column? Are we to assume all office type spaces are to be categorized as Shared Office?