Forum quick links
Supplemental Daylight and Views Calculation Spreadsheet
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Philip Herriges on
I am using the Supplemental Daylight and Views Calculation Spreadsheet that was provided by the USGBC website under resources.
Credit Language - USGBC and Forum - and Addenda
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Tyra Sorensen on
Does the posted credit language for the Credits, both in the USGBC's online Credit Library and here on the forum, reflect the addenda? Or is the credit language the published language and we need
Onsite renewable - Biomass
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Magda Aghababyan on
Hello, We have a biomass boiler of 1.5 tons/hour.
Medical Office Building w/ Decontamination Shower Room
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Daniel Joseph on
We are providing a Core and Shell project for a health care tenant that will be responsible for the interior buildout.
Diesel generator for peak shaving
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I'm involved in a project which will regularly use a diesel generator for peak shaving. May I use this strategy ir order to verify compliance with EA.p2 and take credit in EA.C1?
Tenant Layout
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Philip Herriges on
How detailed does the tenant layout need to be?
Shared Multi-Occupant Controls Tables IEQc6.1-2 and IEQc6
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jennifer Martin on
On Shared Multi-Occupant Controls Tables IEQc6.1-2 and IEQc6,what data is entered in Column: # of Spaces with Controls.
Six assemblies or five for Option 2?
NC-v4 EQc2:Low emitting materialsposted by Nadav Malin on
Under Option 2, the credit language says "The budget method organizes the building interior into six assemblies:" but then proceeds to list only five. Anyone know what the sixth is?
Conference room
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I’m modelling a school in which a conference room is going to be placed. The baseline shall be System 5 - Packaged VAV with reheat.
LEED Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Sasha Peters on
We are currently working for a LEED project which is spread across the project plot area with two office buildings (one “Administrative”- and the other “General”), three warehouses (all unconditio