Paint VOC violation

NC-v4.1 EQc2: Low-emitting materials
posted by Summer Gorder on Feb 3, 2025, 1:32 pm

If 100%...

Last reply: Emily Purcell, Feb 4, 2025, 11:26 am

Existing envelope

NC-2009 EAp2: Minimum Energy Performance
posted by Sandra Holmström on May 13, 2015, 4:49 am

This forum is for an older version of LEED that has sunset. Log in or register to post comments ...

Last reply: Marcus Sheffer, Feb 4, 2025, 10:23 am

FTE For Stadium

Calculating FTEs
posted by KHIM BOK TAN on Feb 4, 2025, 1:53 am

Hi all, 

I am working on a BD+C New Construction project for a football stadium. The estimation of the full time employees is pretty much straight forward. As there will hardly be any...

Energy Model- Proposed Building Heating Loads in Hawaii

NC-v4 EAc2: Optimize Energy Performance
posted by Sachin Shah on Nov 16, 2018, 5:54 pm

Aloha-

We are currently modeling a building in Trace 700, located on Oahu, Hawaii.  The proposed building consists of a water-cooled chilled water system with hot water reheat in select...

Last reply: Anurag Ghosh, Feb 2, 2025, 9:01 pm

Confirmation of no CFC-based refrigerants

EBOM-v4.1 EAp2: Fundamental Refrigerant Management
posted by Daniel Esposito on Oct 30, 2023, 12:45 pm

For the required Fundamental Refrigerant Management credit, there is a check box at the top of the credit page asking to confirm "No CFC-based refrigerants are included in any new mechanical...

Last reply: Mike Joroni, Feb 1, 2025, 3:32 pm

Our project needs some clarification regarding Minimum Indoor Air Quality Performance Calculator.

CI-v4 EQp1: Minimum indoor air quality performance
posted by Nagaraj Sankar on Sep 19, 2023, 4:47 am

One of my LEED v4 ID+C project getting below comments from LEED reviewer for Minimum Indoor Air Quality Performance Calculator (Project having...

Last reply: Nagaraj Sankar, Feb 1, 2025, 4:59 am

Material Quantity Input into EC3

Pilot-Credits MRpc132: Procurement of Low Carbon Construction Materials
posted by Kelli Kimura on Jan 19, 2024, 8:44 pm

Hi all,

We are curious how folks are gathering their material quantities per the pilot credit language "Material quantities shall reflect the final as-built project and be consistently...

Last reply: Kristen Magnuson, Jan 31, 2025, 12:45 pm

Medical space types not listed in the Minimum IAQ Performance Calculator

Healthcare-v4 EQp1: Minimum indoor air quality performance
posted by Edgar Arevalo on Oct 18, 2024, 3:16 pm

I am currently working on a LEED v4 Healthcare project, and the Minimum...

Last reply: BuyAED India, Jan 31, 2025, 5:01 am

Does a Data Hall should be modeled with an Air Economizer in Baseline

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Jan 30, 2025, 3:33 pm

Hi, 

I am working on a Data Center Project in Chicago and the...

Last reply: Shashank Singh, Jan 31, 2025, 1:17 am

Project Occupancy when we are only complying with Indoor Water Use Reduction prerequisite under prescriptive path?

CI-v4 WEp1: Indoor water use reduction
posted by Edgar Arevalo on Oct 25, 2024, 3:17 pm

So we have an interior fit out project where we can only comply with the Indoor Water Use Reduction prerequisite and not the credit.  Since we are only complying with the prerequisite via...