Forum quick links
Historic Places outside the United States
ND-v2009 GIBc6:Historic resource preservation and adaptive useposted by Jose Ng on
Can we meet this credit using an historic building from other country? We need to submit any document certifying that is an histoic building?
Using option 1 phase flush out 14,000 cf of outdoor air per sf
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Benjie Herrera on
If we use phase flush out , (1)phase 1 - delivery of out door air min.
CI project modeling with central building HVAC plant system
CI-2009 EAp2:Minimum Energy Performanceposted by Aditya Chemburkar on
Hi, I am modeling a CI project for which we are going to replace all the lighting and low side Indoor HVAC units.
CS vs EBOM
CS-2009 IEQp1:Minimum IAQ Performanceposted by Markievicz E on
Hi All We have an unusual project... Completed in 2008 but remaining unoccupied thought the 'crisis'.
Solar Panels outside LEED project boundary
NC-2009 EAc1:Optimize Energy Performanceposted by Kalyan Nishtala on
Hi, I am currently working on a LEED project which will pursue renewable energy credit and also count the savings towards EAc1 points.
M&V Template - End Use Metering Table
NC-2009 EAc5:Measurement and Verificationposted by Candice Rogers on
Hello - We're submitting for M&V under LEEDv2009. We're going with Option D - Calibrated Simulation. Our energy model did not use the performance path.
LeedOnLine Forms Incorrect
CS-2009 EAp2:Minimum Energy Performanceposted by Thomas Newbold on
I am having a problem with LeedOnLine and USGBC hasn't been any help.
SEED evaluator tool
ND-v2009 NPDc12:Community outreach and involvementposted by USGBC Colorado on
Are you aware of project teams using the SEED (social, economic, environmental design) evaluator tool http://www.seednetwork.org/ as a strategy to achieve this credit?
Contractual Relationship
CI-2009 EAc2:Enhanced Commissioningposted by Brian Smith on
The owner is looking for CI-2009 Enhanced Cx on a project. The CxA was originally contracted through the GC as they were not a prequalified vendor of the Owner.
Documentation for upload
NC-2009 SSc1:Site Selectionposted by Olga Kozub on
I have a project in Russia. In Russia we use the local equivalent of the United States Code of Federal Regulations named State Immovable Property Cadastre.