Hi,
I am modeling a CI project for which we are going to replace all the lighting and low side Indoor HVAC units. The high side HVAC system is a central plant common for the complete building.
The indoor HVAC unit of this CI project will be connected to the common central HVAC plant of the building. Please guide how to model the HVAC system for the analysis and how we can claim points under EA CR 3.0- Optimize Energy Performance HVAC.
Thanks
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5909 thumbs up
August 26, 2013 - 9:39 am
I would suggest that you should read the information above and the LEED Reference Guide for general guidance on how to do this modeling.