The owner is looking for CI-2009 Enhanced Cx on a project. The CxA was originally contracted through the GC as they were not a prequalified vendor of the Owner. During that time, the design reviews were completed as required. The project is well into construction and the owner is looking to see if any type of contractual arrangement can be made, not direct to the owner, to achieve the intent of the point. Can the owner hire a consultant, who would in turn contract with the CxA?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Scott Bowman
LEED FellowIntegrated Design + Energy Advisors, LLC
LEEDuser Expert
519 thumbs up
September 6, 2013 - 5:47 pm
I hate to be a downer, but I do not think there is any way. The design reviews were done while under contract to the GC.
Sorry…