Forum quick links
On Site Renewable
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Joseph Snider on
The project would like to consider this credit. For that a PV system was previously installed and has been in operation within the performance period.
water efficiency review
NC-2009 WEc3:Water Use Reductionposted by Shristi Bajracharya on
When we sent the WE credit for review for our project, we sent a water use calculation stating that the potable water usage in the project has been reduced by 43% from a calculated baseline design.
Preferred parking in master site project
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Lolita Wu on
We are working on a master site with three buildings in the block. Two office buildings are pursuing LEED CS and a hotel building is pursuing LEED NC.
50% of material purchase & composite panel question
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Karin Wohlert on
Achieve sustainable purchases of 50% of total purchases (by cost) during the performance period.
LEED CI applicability
posted by Esther Izquierdo on
Hi, I am working on a commercial project where the new owner is planning a fit-out renewal. The owner will occupy 90% of the space, with 10% being sub-let.
Views and Interstitial blinds
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Sean Hogan on
Hi, I'm working on a project where south, east and west elevations will have twin skin glazing with interstitial blinds.
Can we go for enhanced commissioning after start of operation
NC-2009 EAc3:Enhanced Commissioningposted by Abdulrahman Sherazy on
Our client have decided suddenly to go for enhanced commissioning. The construction is complete and the building starts to operate. The fundamental commissioning has been already done.
Terminology Clarification?
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by John Nichols on
Hello, I have two questions related to the terminology used in this credit: 1) Could someone help clarify what is meant by the phrase "designed to work in concert" within the Credit Requirements?
Exceptional Calculations
NC-2009 EAp2:Minimum Energy Performanceposted by Stephen DeGrazio on
I have a new bubilding which will be mostly a performing arts theater and school gymnasium.
Construction Documents
posted by Scott Robb on
Where would the best place be to locate a comprehensive set of "standard" LEED contract documents. I am talking about "New Construction" and "Commercial Interiors".