100% OA VAVs
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Jeremy Kuhre on
We are remodeling two floors of a high-rise office tower. A 100% OA VAV introduces OA into the mechanical room for each floor where it is mixed with return air.
Cooling Tower Submetering
NC-2009 EAc5:Measurement and Verificationposted by Saju Varghese on
Under the reference guide, it is requiring for process water to be submetered, which according to the glossary involves cooling tower water, boilers and chillers, but if the cooling tower is servi
Tables not displaying
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Nelina Loiselle on
The tables (1-4) referenced in the Credit Language tab do not display. Please advise. Thank you!
Gym Memberships and shower access for C&S
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Robyn Vettraino on
The FTE Occupants on the project is 123, and therefore 1 shower should be required in my opinion. The project secured a complete gym membership for 1 full time employee on the Project.
Tile Crack Prevention Underlay
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by L W on
Does tile crack prevention mat underlay (with a polyurethane self-adhesive ) have to meet FloorScore standard for C&S Project?
Case 2 Calculator - Space Types
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Timothy Casper on
Our project is a mixed use building used by community groups and has several different space types within it (theater, classrooms, event areas, kitchen, offices).
Connection of sidewalks
Pilot-Credits PC14:Walkable Streetsposted by Karyn Rodrigues on
For this credit, one of the requirements is "Continuous sidewalks [...] serve all buildings [...] and connect them with public sidewalks.".
Manual Equipment
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Timothy Casper on
Can manual equipment (ex: a carpet sweeper) that is used in place of powered equipment (ex: a vacuum) be counted when trying to achieve the 20% threshold for compliant inventory equipment?
One built-out floor in a CS
NC-2009 PIf3:Occupant and Usage Dataposted by Jason Biondi on
I am working on a three story office building, that is registered as LEED Core & Shell, where the 2nd floor will be built-out for the owner's company, which means we know the occupancy of the 2
Review
NC-2009 WEc3:Water Use Reductionposted by Alicia Villanueva on
My project has achieved a 82% savings in flow & flush fixtures through recycling 100% of the waste water and reusing it for WC and urinal flushing. We documented this with a spreadsheet. Howe