Forum quick links
EAp2/EAc1 - Case 2 Option 2b
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Peter Locke on
We are submitting a museum bldg and have had confirmation from GBCI that we can use Case 2 - historical data to compare against.
existing parking garage in the LEED project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by yanghee pierce on
I am working on a project that is a part of campus. This project will be located next to a 4-story existing parking garage shared by other adjacent non-LEED certified buildings.
Clarifications
Healthcare-v2009 SSp1:Construction activity pollution preventionposted by BABAR MEHMOOD on
Since the prerequisite is related to the construction and involves mainly the main contractor on this. As a consultant we will include the requirements of this prerequisite.
Buried Tiles
NC-2009 WEc1:Water Efficient Landscapingposted by Amy Hood on
How feasible is it to provide a way to use storm water from the buried tiles (or ahead of them) for grass and garden watering.
ITE Parking Generation - Which data should be considered?
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Daniel Brum on
Our project is a mall, situated in a place with no local zoning requirements for parking.
LEED CI certificate belongs to Bld Owner or Tenant?
NC-2009 PIf1:Minimum Program Requirementsposted by Regina Gul on
Who owns the LEED Commercial Interiors certificate - the Tenat who hires the LEED AP and pays for the whole certification process, or the Owner of a Building where the Tenat's certified space is l
WEc2 vs. Pilot Credit 10
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Anna Korinkova on
Hi all, do I understand correctly that the pilot credit allocates WEc2 requirements to Option 1 and Option 2 and adds Option 3? My project reduces use of potable water of 47 % just by installing ef
Can Low missission gas generator qualify for EAc2?
NC-2009 EAc2:On-Site Renewable Energyposted by Mahbuba Khan AIA, LEED AP BD+C on
I am doing a factory building in Dhaka Bangladesh. To offset the power outage, they are going to use gas generator.
SOP's
EBOM-2009 IEQp3:Green Cleaning Policyposted by David Wood on
For this prerequisite, do you need to put the specific SOP's for the building? Example Floor-care maintenance shall consistently be performed according to written protocols, without exception.
Plastic Laminates
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Lance Barron on
The inclusion of plastic laminates (for countertops, etc.) are included in IEQc4.4 is not clear.