Hi all,
do I understand correctly that the pilot credit allocates WEc2 requirements to Option 1 and Option 2 and adds Option 3?
My project reduces use of potable water of 47 % just by installing efficient toilets and urinals. The total reduction of 55 % is achieved by harvesting rainwater and using it for flushing toilets - therefore I have chosen the Option 2. However, what if there is no local code addressing reused water? Credit's language states that "Reused water must meet the applicable local code, for its intended use (e.g., on-site irrigation, toilet flushing, cooling tower).".