Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Material Reuse on Other Buildings within Site Boundary

NC-2009 MRc3:Materials Reuse
posted by  Josh Sawyer  on 

We are working on project that has four buildings connected together on the site.

1
Mon Apr 15, 2013, 1:53 pm

Signage translation

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Albert Sagrera  on 

Hi, In our project we're reserving prefered parking spaces for low-emitting, fuel efficient and carpool vehicles. The signage would be painted on the floor of the parking space.

1
Tue Apr 16, 2013, 8:44 pm

Toilets not within the tenant space

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Mike D  on 

For WE Prerequisite 1 and WE credit 1, should toilets that are not within the tenant space be included in the calculations? If not, how do we complete the online form as it marks incomplete when th

1
Mon Nov 4, 2013, 4:48 pm

Providing verification that there will be side stream filtration

Pilot-Credits WEpc17:Cooling tower water use
posted by  Sara Greenwood  on 

Our project is pursuing an ID point for Pilot Credit 17 under the LEED-NCv2009 rating system.

0

Guidelines for large projects that are greater than 500,000 sf

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Lauren Sparandara  on 

Hello, I am working on a large development that has several buildings that are greater than 500,000 sf.

1
Wed Apr 17, 2013, 3:57 pm

acrylic cove base adhesive for wall

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Benjie Herrera  on 

The acrylic cove base adhesive for wall is not listed in the LEED online-adhesive and sealant-non flooring. Where do we classify this adhesive?

1
Wed Jun 5, 2013, 12:13 pm

Energy Model for building with under floor air distribution

CS-2009 EAp2:Minimum Energy Performance
posted by  farhana imran  on 

We are working on a business tower with 2B+G+ 27+Roof floors. The tower has raised floor with UFAD/TDV systems from ground floor to 27th floors except toilets areas in each floor.

1
Tue Apr 16, 2013, 1:42 pm

Change of rating system

LEED Rating System Selection
posted by  Lolita Wu  on 

Dear all We registered a project as LEED NC, but due to recent alterations, we need to switch it to LEED CS. How to change the rating system?

1
Tue Apr 16, 2013, 12:55 pm

Which calculator version I have to use

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Patricia Fuertes  on 

I have downloaded the "USGBC LEED 62MZCalc (May 2011) and I have to complete manually the cells that correspondon to the "Inputs of the system".

1
Tue Apr 16, 2013, 2:45 pm

Non Potable Water Source Use

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  Rajesh Ghorla  on 

What QC process can be added to identify variances from Standard Approach and what measures can be take.

1
Wed Jul 31, 2013, 4:27 pm