Forum quick links
Group Project Certification
posted by Deborah Lucking on
We have a project that comprises 2 office buildings, a parking garage, and a support building with seminar rooms and staff amenities.
Modeling multiple buildings for Master Site
NC-2009 EAc1:Optimize Energy Performanceposted by Erika Duran on
We are pursuing Master Site certification on several buildings that are served by the same plant.
If an open plan office is
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Alicia Villanueva on
If an open plan office is designed with occupancy sensors and manual override: do all workstations qualify towards this credit? GH
Flush out and un-touched area in LEED boundary
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Todd Bundren on
My project includes the renovation of an existing building and a major attached addition (over 70% of the project is new construction).
City of LA Recycling Rates Application
CS-2009 MRc2:Construction Waste Managementposted by Michelle Spillman on
We are currently using an off-site materials recovery facility that is providing documentation each month showing specific weight breakdowns for Trash, Wood, Cardboard, Dirt, Inert and Metal.
PARTITIONS ARE CONSIDERED FURNITURE?
NC-2009 MRc4:Recycled Contentposted by Florinda Garcia on
I would like to know if i have to consider the partitions in the LEED budget.
Underground LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Luis Miguel Diazgranados on
Greetings I'm working on an office project with underground parking. There is a LEED boundary which has been drawn for the street level, but the underground parking goes beyond this boundary.
10' mat requirement with revolving door
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Jean Savitsky on
We have a building where there is a revolving door flanked by two hinge doors.
Space by Space method
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Tejaswi Damaraju on
Hello, I am working for a Retail-commercial interiors project with less than 5000 Sq feet of space.
Energy Cost Budget Method
CI-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, we have just certified a building as Core and Shell, but now the owners want to achieve also the Commercial Interior certification.