Forum quick links
no humidity control
CS-2009 IEQc7:Thermal Comfort—Designposted by Adam Targowski on
Can a project without humidity control get a point under this credit?
Greenfield Sites1: site disturbance
Schools-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Ameet AA on
Sincere Apologies for reposting the question but anyone out there could assist.Thank you!! If the Master plan level School project's (Multiple buildings within the development) site boundary will
Continuous flush out?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Erin Holdenried on
For Option 1 Path 2, can there be a time gap between when the pre occupancy ends and post-occupancy flush out begins? Or does one have to immediately follow the other?
Recertification with new criteria
posted by Geoffrey Tomlinson on
A recently certified EBOM project will likely need to be recertified under LEED v4. How are they going to treat changes and or new credits during the performance period.
Division 12 in MR credits
NC-2009 MRc4:Recycled Contentposted by Joseph Ford, AIA on
I am wrestling with what this part of the MR credit overview says: "A project team may include materials costs from CSI MasterFormat Division 12 - Furniture and Furnishings as long as this is don
PI FORM 3 Version 4: Complex Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Curtis Clark on
Under "Complex Occupancy", it states to upload "PIf3-1" to calculate FTE. Is this a spreadsheet that we create or is there on on-line form?
Exterior LPD for Block Project
NC-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
We registered a block project; the Campus boundary includes land scape, existing non-LEED buildings and two LEED certification candidate buildings.
Project Information (PI) forums
posted by Tristan Roberts on
LEEDuser now has a dedicated set of forums, including sample documents, for Project Information forms.
Exemplary performance for offsite land
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Heather Holdridge on
We are planning to donate offsite land to a land trust to gain earn this credit. This land will be equal to more than 75% of the previously developed area (including the building footprint).