Acceptable Testing Evidence?

Pilot-Credits EApc8:Demand response
posted by  Terry Gorski  on 

What type of evidence of Demand Response testing being conducted would be acceptable to submit for a building that has 3rd party systems involved and does not receive any documentation of the actua

1
Mon Aug 6, 2012, 1:35 pm

Define "Weatherproofing System"

Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Steven Woods  on 

The roof on our building is constructed as follows: structural steel framing, metal roof deck, vapor barrier, rigid insulation, ventilated nail base insulation panel (a pre-fabricated unit of OSB o

1
Tue Jun 12, 2012, 2:22 pm

Exterior Renovation Project

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Edward Malesevich  on 

A project I am currently working on is undergoing an exterior renovation project.

1
Tue Jun 12, 2012, 5:45 pm

Metering equipment and instruments

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Lourdes Salinas  on 

We are about to perform the inventory of water flow of the fittings and fixtures in a manufacturing plant. Any recommendations about metering equipment and instruments?

1
Tue Jun 12, 2012, 2:46 pm

Sample size for air speed measurements

EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoring
posted by  Peter Locke  on 

Does anyone have a comment on the number of spaces (% of spaces?) that an air speed sample would need to include?

1
Mon Sep 10, 2012, 4:12 pm

Doubt about off-site area

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Alicia Villanueva  on 

Hello, I have a question regarding the off-site area.

1
Thu Jun 21, 2012, 10:22 pm

Dan,

General forums
posted by  Emily Catacchio  on 

I would suggest contacting GBCI directly about any potential loss of documentation. I believe some will be lost, but GBCI will be able to more specifically answer that question. 

0

Major Renovations with Additions

NC-2009 EAc1:Optimize Energy Performance
posted by  steven maynard  on 

EA Credit 1 allows for different percentages of energy performance for "Existing Building Renovations" than for "New Buildings", but there does not appear to be any information in the reference gui

1
Tue Jun 12, 2012, 9:29 pm

ASHRAE Thermal Comfort Tool version 2

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  paul martin  on 

The ASHRAE Thermal Comfort Tool V2 software is based on ASHRAE 55-2010, but LEED-2009 uses 55-2004.

1
Tue Jul 24, 2012, 8:22 pm

thermal blocks for open plan offices

NC-2009 EAp2:Minimum Energy Performance
posted by  Rosana Correa  on 

I am modeling an office building which has 2 open-plan offices facing 3 different orientation each.

1
Mon Jun 18, 2012, 1:16 pm