CS-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
We are working on CS project, a shopping mall, 57% is major renovation while the other 43% is expansion.
measuring and reporting temperature & RH
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Eri Spaulding on
Does anybody know how to measure and report indoor temperatures and relative humidity during flushout? Do we need to record min. and max. every single day at every single room?
Process Energy for Manufacturing facility
NC-2009 EAp2:Minimum Energy Performanceposted by Johnathan Woodside on
I have seen several posts pertaining to process energy and how it should be modeled, but I am still unclear as to how it should be treated pertaining to manufacturing process energy.
Separate Heating and Cooling Plants
posted by James Del Monaco on
Our project is located on a University campus with two separate DES buildings. One DES building houses all the chilled water equipment including chillers, pumps, cooling towers, etc.
eQuest for LEED Experience
NC-2009 EAp2:Minimum Energy Performanceposted by Sam Watters on
Hello, My project team is looking into doing the energy modeling for a project in house, and I am wondering if anyone has a sense of how much experience is necessary to learn to use eQsuest softwa
Non-LEED Certifiable buildings definition?
posted by Kerrie Kannberg on
Hi, In the MPR 2011 revisions there is mention of having a site boundary with either multiple LEED certifiable buildings within the boundary, thus using the AGMBC, or having Non-LEED Certifiable b
IEQp1 ASHRAE 62MZ Calculator-Please Help
NC-2009 IEQp1:Minimum IAQ Performanceposted by Helen Williams on
Help please! I have to submit the 62MZ Calcualtion today on a Storage Facility Project. IEQ Prereq 1 was denied and now in appeal.
Roof or Non-roof?
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Katherine Ann Resurreccion on
Hi All, We are working on a high-rise office project that will sit on top of an existing structure.
Materials Reuse-Clarification of credit implementation
NC-2009 MRc3:Materials Reuseposted by Elle Brown on
Can some one clarify if I'm understanding the implementation of this credit correctly? If material is salvaged onsite it must be used in a purpose other than for which it was intended (except for
LEED Boundary
posted by Nanechka Pagan on
The project consist of the construction of a new middle school and the remodelation of the existing elementary school both will shared some areas like the existing parking and the electric substati