Forum quick links
PIF4 Project Information Form 4
posted by Markus Henning on
Our project’s Design Review Submittal was returned with various comments across the board (prereqs, credits and even to PI forms).
Natural Gas Chiller
Pilot-Credits EApc8:Demand responseposted by Jacqueline Bradbury on
Does a natural gas chiller qualify for the Demand Response credit? Onsite generation of electric is specifically excluded, and this is somewhat related, althought not exactly.
Transpired Solar Collector
NC-2009 EAc2:On-Site Renewable Energyposted by Tyler Barter on
For an upcoming project we are proposing using a metal wall system that acts as a transpired solar collector to bring preheated air into the building.
Acrylic masonry sealer
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Gabriela Hernández Castillo on
We have a product that is an "acrylic masonry sealer" with a VOC content of 81 gr/lt.
IEQP1_Sample Letter of Appeal
NC-2009 IEQp1:Minimum IAQ Performanceposted by susan eguia on
Hi, Is anyone whom could share sample template for appeal to USGBC. Also, what is the fastest way to contact the assigned reviewer for the project aside from feedback. Appreciate any assistance.
IEQ Credit 5 - Air Recirculation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by eric jendro on
I have school with a wood shop. There is a dust collector that exhausts saw dust from the equipment and recirculates the air back to the space after being filtered.
Ventilation in residential portion of mixed use project
NC-2009 IEQp1:Minimum IAQ Performanceposted by David Sheridan on
My client is developing apartments over first floor retail in an old building in the central business district.
Shower sets composed of two different fixtures
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Francisco Sanchez Arroyo on
If a shower is composed of an overhead shower with 9 lpm and a hand shower with 6 lpm with a diverter (you can select either the overhead shower or the hand shower).
IEQp1 Compliance ?
CI-2009 IEQp1:Minimum IAQ Performanceposted by George Bender on
Office floor of a high rise building trying to obtain LEED sliver. Floor is served by AHU, which serves 30 other floors not in scope. VAV's serve multiple zones on this floor.
CI Project retail Store - EA PR2, ASHARAE 90.1, Section 9.4.1.2
CI-2009 EAp2:Minimum Energy Performanceposted by Sustentator Argentina on
Hi, I have a question regarding the Space Controls. The controls installed, control the spaces remotely and they are located inside the electric panel.