Forum quick links
90.1 - Air-side Economizer & Humidity Requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Charles Daze on
I have a 90.1 App G. interpretation question. G3.1.2.6 requires economizers in certain climates. The only exceptions are for gas-phase air cleaning and supermarket open refrigerated cases.
Natural Ventilation in Multifamily Residential
NC-2009 IEQp1:Minimum IAQ Performanceposted by Omer Moltay on
Which of the following types of spaces in dwelling units need to be provided with an engineered natural ventilation system (ie. exhaust fans) if they are located 25 ft.
"Any combination of the following strategies.."
Schools-2009 SSc7.1:Heat Island Effect—Nonroofposted by Shakir Ismail on
For a LEED for Schools project I'm working on.
Date Stamped Photos
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Maya Karkour on
Dear all, There are many cameras which do not print a datestamp on the photos (new cameras usually save the date in the photo properties). Can the person who captures the photos, manually put the
Materials Counted for other MR Credits
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Janene Bolt on
In pursuing this pilot credit, can we count materials that have already been counted for MR credits?
Precertification
posted by Lawrence Lile on
I have never done a precertification process before, and the information in the reference guide and the USGBC website is quite brief.
EAc1.4
CI-2009 EAp2:Minimum Energy Performanceposted by Linda Delair on
Are the requirements for Energy Star office equipment,electronics and appliances only for those which are newly purchased?
Purchasing Carbon Offsets for Construction Vehicles
NC-2009 IDc1:Innovation in Designposted by Andrew Gil on
A local college (and long-time USGBC enthusiast) has asked me whether I thought it feasible to obtain an ID credit for the purchase of carbon offset for construction vehicles for an upcoming large
Dormitory project with no parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jay Murray on
We are working on a project in Boston. A new dormitory on a college campus. The project is the 17 story dormitory building, there is no new parking as part of this project.
EAp2-7 Example Spreadsheet
NC-2009 EAp2:Minimum Energy Performanceposted by AAME User on
Can anyone point me towards an EAp2-7 example spreadsheet filled out complete for reference?