Can anyone point me towards an EAp2-7 example spreadsheet filled out complete for reference? The spreadsheet required by LEEDonline is a little "vague" regarding what it wants for some of the input parameters and the example spreadsheet in the LEED BD+C 2009 Reference Guide appears to be old and/or incomplete.

Thanks!