Forum quick links
Shower calculation
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Michael Smithing on
We have 330 FTE and 2 showers. The credit requirement is 1 shower for the first 100 FTE and 1 for each subsequent 200 FTE.
Slow Data Entry
posted by Brian Baril on
I am using IE to upload data into the materials credits, and the process is just mind-boggingly slow. To tab between cells on the online form takes a minimum of 10 seconds.
Baseline PTAC sizing
NC-2009 EAp2:Minimum Energy Performanceposted by April Ambrose on
I have a residential facility seeking LEED v2009 certification with small room loads (approx 2,000 BTU/hr).
Existing Parking Lot
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Dan Forino on
For a NC 2009 project we are building an addition to a building on an which will replace part of an existing campus parking lot.
v2009 NC Split Review
posted by Francisco Villela on
I have just submitted Design Preliminary Review for my project.
Confidential Materials Cost Budget
CI-2009 MRc4:Recycled Contentposted by samala hartley on
This LEED CI project would like to maintain privacy in regards to their materials budget.
7 Year Lease and 5 Year Option to Renew
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Crissy Tsai on
The tenant has a 7 year lease currently with an option to renew for 5 years. Would this comply with the 10 year lease option. Crissy
4" Slab on Grade STC rating
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by renee jimenez on
The first floor of my classrooms are slab on grade which per the LEED template should have an STC of 50 because its ajacent to the outdoors (grade being the outdoors).
Should we consider Hotel Room Showers?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Francisco Sanchez Arroyo on
Should we have to consider the shower heads of the guest rooms?
Smoking During Construction
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Jessica Diaz on
Our project is a school located in Puerto Rico, where the tropical climate allows for natural ventilation and where we don't use the HVAC system during construction.