Forum quick links
Comments received for final design review
CI-2009 IEQp1:Minimum IAQ Performanceposted by monu goyal on
we had received following comments from GBCI for final design review for IEQP1 credit: Revised documentation has been provided including a response narrative, revised Ventilation Rate Procedure (V
Office shell space
CS-2009 IEQp1:Minimum IAQ Performanceposted by Orlin Velinov, PE on
We have C&S office building where the majority of the spaces are shell spaces for future office space.
Occupied Spaces
EBOM-2009 IEQc2.4:Daylight and Viewsposted by American University on
My question is whether areas like corridors, bathrooms, etc should be included or merely spaces like offices, classrooms, etc where people spend time rather than just passing through.
Mandatory Provitions - Fenestration and Doors
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hi, I have an air conditioned warehouse, where wine will be sotored, and it has two doors, with now vestibules.
Hand Sanitizer
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Johanna Ofner on
My project facility has hand sanitizing stations throughout the building filled with a EcoLogo (CCD-170) certified Hand Sanitizer. Does this count for anything?
Energy Star Appliances & Equipment as Innovation for LEED-NC
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Kris Callori on
Does anyone have experience submitting this for an innovation credit under the LEED-NC rating system?
Building Type Method or Space-by-Space on Construction phase
NC-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
If same Lighting Power Density (W/sf) was used in all zones during the design phase using Building Type Method, should we switch to space by space on its final stage?
Power Quality Meters
CI-2009 IDc1:Innovation in Designposted by David Edenburn on
Has anyone gotten a point for installing power quality meters? We have the usual power quantity meters, but the client is asking if there is a LEED incentive for cleaning up the power.
Pressure Sensitive Tape and Other Tapes
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Bruce Maine on
I keep being asked if Pressure Sensitive Tape qualifies as an adhesive subject to review for EQ c4.1. Normally I'd say no but some carpet installations use similar products.
Integrative Process Credit
posted by Melissa Wrolstad on
For BD+C: What do they mean by "cascading" in the phrase - "demonstrate how at least one on-site non-potable water supply source was utilized in cascading ways to reduce the burden on municipal sup