Forum quick links
Material valuation system - BASTA
Pilot-Credits MRpc54:Avoidance of chemicals of concernposted by Tanja Arnesson on
In Sweden we use a material valuation system that is called BASTA, this system is only for chemicals.
Sampling Rate
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Ehsan Baharvand on
Hi, I have an issue with regard to CO2-metering in practice.
Adjustable valve for WC fixtures
CS-2009 WEp1:Water Use Reductionposted by Maya Karkour on
Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly. The Contractor is suggesting a WC fixture with a maximum flush rate of 3/6 LPF, but with a regu
Adjustable valve for WC fixtures
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Maya Karkour on
Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly. The Contractor is suggesting a WC fixture with a maximum flush rate of 3/6 LPF, but with a reg
Residential Dual Flush Fixture Usage
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Rosenberger on
We are evaluating dual flush fixtures for our residential project. I see in the Water Use Reduction guidance the weighted average methodology.
L-3 form
posted by Tristan Roberts on
Danny, the form you're referring to has been an integral part of LEED-2009 MR documentation, but there is no equivalent for v2.2.
LEED 2009 NC-Certifying an Addition & NON-LEED Existing Building
posted by Sergio Ortiz on
I am currently involved on a project in its early stages of conceptual design and will shortly move into the SD phase.
LEED EBOM for Industrial Building?
posted by Omer Moltay on
Dear All, Is LEED EBOM applicable to an industrial building (specifically a sock factory)? The Rating System document mentions that the system is applicable to "existing commercial and institutio
Commissioning for overseas projects
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Natalie Tan on
Hi, we have a small USGBC LEED-NC project (400m2) in Kuwait where the Owner wants us (LEED Consultancy firm in Canada) to hire a commissioning agent (as the "brain") in canada to oversee the commis
LEED Project Submittal Tips from GBCI Review Teams
posted by Elizabeth Thompson on
An updated version of the LEED Project Submittal Tips is now live on the GBCI website, here: http://www.gbci.org/main-nav/building-certification/resources.aspx#tips.