Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Material valuation system - BASTA

Pilot-Credits MRpc54:Avoidance of chemicals of concern
posted by  Tanja Arnesson  on 

In Sweden we use a material valuation system that is called BASTA, this system is only for chemicals.

0

Sampling Rate

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ehsan Baharvand  on 

Hi, I have an issue with regard to CO2-metering in practice.

1
Fri Feb 10, 2012, 7:22 pm

Adjustable valve for WC fixtures

CS-2009 WEp1:Water Use Reduction
posted by  Maya Karkour  on 

Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly. The Contractor is suggesting a WC fixture with a maximum flush rate of 3/6 LPF, but with a regu

1
Tue Feb 21, 2012, 9:48 pm

Adjustable valve for WC fixtures

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maya Karkour  on 

Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly. The Contractor is suggesting a WC fixture with a maximum flush rate of 3/6 LPF, but with a reg

1
Fri Feb 17, 2012, 6:19 pm

Residential Dual Flush Fixture Usage

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michelle Rosenberger  on 

We are evaluating dual flush fixtures for our residential project. I see in the Water Use Reduction guidance the weighted average methodology.

1
Thu Jan 5, 2012, 11:20 pm

L-3 form

General forums
posted by  Tristan Roberts  on 

Danny, the form you're referring to has been an integral part of LEED-2009 MR documentation, but there is no equivalent for v2.2.

0

LEED 2009 NC-Certifying an Addition & NON-LEED Existing Building

LEED Rating System Selection
posted by  Sergio Ortiz  on 

I am currently involved on a project in its early stages of conceptual design and will shortly move into the SD phase.

1
Sat Dec 31, 2011, 3:42 am

LEED EBOM for Industrial Building?

LEED Rating System Selection
posted by  Omer Moltay  on 

Dear All, Is LEED EBOM applicable to an industrial building (specifically a sock factory)? The Rating System document mentions that the system is applicable to "existing commercial and institutio

1
Mon Jan 9, 2012, 6:13 pm

Commissioning for overseas projects

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Natalie Tan  on 

Hi, we have a small USGBC LEED-NC project (400m2) in Kuwait where the Owner wants us (LEED Consultancy firm in Canada) to hire a commissioning agent (as the "brain") in canada to oversee the commis

1
Wed Jan 11, 2012, 1:56 pm

LEED Project Submittal Tips from GBCI Review Teams

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Elizabeth Thompson  on 

An updated version of the LEED Project Submittal Tips is now live on the GBCI website, here: http://www.gbci.org/main-nav/building-certification/resources.aspx#tips.

0