Forum quick links
Definition of hard-lid ceiling?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Renee Shirey on
I have a situation where I cannot eliminate a sloped acoustic ceiling with a gyp ceiling, and the walls do not go up to the deck (they go to the underside of trusses).
Water Calculations for Landscape Irrigation
posted by Loretta Newcomer on
I don't really have a question at this point. We have completed our project and submitted the paperwork; however, I would like to voice my frustration over the water calculation tool.
Base building EBOM credits denied
CI-2009 IDc1:Innovation in Designposted by Raphael Sperry on
I've had a pair of CIv2009 projects just denied (at first review) a couple of innovation points where the base building provides Green Cleaning, Integrated Pest Management, and a Zero-Waste Plan to
Open Space and LEED Project Boundary
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Sara Neff on
If there are city/state/federal restrictions on development such that development in certain areas is prohibited by law, can I include those areas in the LEED project boundary?
Sealants and gaskets
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by ruffina thilakaratne on
we are using polyurethane and silicone sealants and gaskets in fire barriers and glazing works. which LEED standards should I refer to? is VOC a concern? thanks
Commissioning innovation point
CS-2009 EAc3:Enhanced Commissioningposted by Magnus Stagnäs on
The reference guide states that CS projects requiring both fundamental and enhanced commissioning for all tenant spaces may be considered for an innovation point.
Interpretation doubt
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Carolina Vergnano on
Hello, I've got a doubt about the time that we should develop the breakdown of energy.
Owner Agent required information
NC-2009 EAc2:On-Site Renewable Energyposted by Francisco Villela on
Marcus, I am looking at the on-line form for EAc2 On-Site Renewable Energy. (LEED 2009 for New Construction) The asterisk occurs after each of two Required Signatory boxes.
Ceiling "Reuse"
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Caroline O'Leary on
I'm cross posting from CI MRc1.2: I see this was partially covered in Jean's discussion but I'm going to see if any of you have any further clarification.
Re: Community development project certification
posted by David Posada on
You might try posting your question at the forum topic for LEED-ND projects: http://www.leeduser.com/topic/leed-neighborhood-development-leed-nd-forum