Forum quick links
Huge relief
posted by Ricardo Sobral on
For international users of LEED rating systems, this ruling is a huge relief, and help us implement sustainable practices in our countries.
Roll-out Mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Caroline O'Leary on
As I'm writing an e-mail to a client regarding the requirements for roll-out mats to meet LEED requirements, I'm questioning the following - if we have walk-off carpet installed over the entire Lob
Exemplary Performance
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Sheela I on
I am currently working on a project which has 1 train station stop @ 0.2 miles (walkable distance) and 4 bus stops with in 0.2 mile (walkable distance) to the project site.
The tenant sales and lease agreement - Lighting
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by John Harrington on
Does anyone know if the developer/owner can specifiy a requirement for a tennant to design lighing Power Density (%5) or more below ANSI/ASHRAE/IESNA Standard 90.1-2007 - Table 9.6.1 Lighting Pow
Modern methods of construction
NC-2009 MRc2:Construction Waste Managementposted by Bradley Guy on
In its current form the MRc2 is for diverting waste that has been created, it does not credit 'preventing' waste, however please take a look at the LEED 2012 2nd public comment version of this cred
LEED HC and NC at the same time
posted by Joshua ADY on
Kindly clarify if a Hospital Project would be allowed to pursue both LEED NC and LEED HC simultaneously .
lavatory faucets with different flow rate
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Grace Ming on
Hello All, In our project, we have 2 types of lavatory faucets (different quantity) with two different flow rates. One type constitutes 20% and the other type 80% of total faucets.
100 ft wetlands setback
CS-2009 SSc1:Site Selectionposted by Ben Tucker on
Our site is previously developed and we will be performing a major renovation on the existing building.
Green Power for LEED-CI Retail
CI-2009 EAc4:Green Powerposted by Linda Davisson on
Can anyone confirm that Green Power is 2 points for LEED-CI Retail instead of 5 points for LEED-CI?
Interactive Compliance Forms.
CI-2009 EAp2:Minimum Energy Performanceposted by elizabeth warlop on
If I am not altering the HVAC, Or Building Envelope, or Service Water, Do I have to fill out the Interactive Compliance Forms, ie the Building Envelope, the HVAC Compliance the Service Hot water.?