Option 2, Outside US
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Anna Korinkova on
Hi all, We are working on a project situated in the Czech Republic, Prague. Is it possible to go for Option 2 and use Prague Planning Office as a metropolitan planning organization?
RPCs for projects registered under LEED CS v.2.0
Schools-2009 RPc1:Regional Priorityposted by Alicja Bieszyńska on
As far as I am concerned, any LEED 2009 projects can get Regional Priority Credits.
It doesn't seem like this
NC-2009 EAc5:Measurement and Verificationposted by Maura Adams on
It doesn't seem like this credit should be so complicated. We have a full DDC system in the new building, which is part of a campus.
Meeting humidity requirements with mixed mode
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Carly Ruggieri on
Does anyone have any experience or guidance for documenting compliance with ASHRAE 55 with a mechanically conditioned, naturally ventilated building?
Polymerized urea formaldehyde resin
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Katie Ellsworth on
We have laminated particleboard also known as melamine panels which states it's formaldehyde free but has polymerized urea formaldehyde resin in it. Can we still get EQ credit for it?
Product Takeback Programs?
NC-2009 MRc2:Construction Waste Managementposted by Jonathan Weiss on
Some manufacturers have "take-back" programs where they will take back unused surplus materials and restock them - the WBDG has that listed under masonry and other spec sections.
Existing Fixtures Calculated in Installed Lighting Power?
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by David Rodriguez on
I have a renovation project where there are three rooms in which we are not replacing the light fixtures.
Tenant area commissioning
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by sompoche sirichote on
Our project is an office building with 10 floors on the top are leased out as a hotel tenant and we are seeking for LEED CS certified. If the mechanical and electrical plant of the hotel are separa
Baseline HVAC Equip Vs. Proposed HVAC Equip
NC-2009 EAc1:Optimize Energy Performanceposted by Greengrade User on
Question: Does the HVAC system for the baseline have to be the same type as the proposed design HVAC equipment? (ie.
Asphalt Roll Roof Recycling
CI-2009 MRc2:Construction Waste Managementposted by Sabrina B on
I am working on a existing building renovation. The existing roof, which will be demo'd, is asphalt roll with batt insulation underneath.