Option 2, Outside US

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Anna Korinkova  on 

Hi all, We are working on a project situated in the Czech Republic, Prague. Is it possible to go for Option 2 and use Prague Planning Office as a metropolitan planning organization?

1
Tue Aug 16, 2011, 8:31 pm

RPCs for projects registered under LEED CS v.2.0

Schools-2009 RPc1:Regional Priority
posted by  Alicja Bieszyńska  on 

As far as I am concerned, any LEED 2009 projects can get Regional Priority Credits.

1
Fri Sep 2, 2011, 4:04 pm

It doesn't seem like this

NC-2009 EAc5:Measurement and Verification
posted by  Maura Adams  on 

It doesn't seem like this credit should be so complicated. We have a full DDC system in the new building, which is part of a campus.

1
Mon Sep 19, 2011, 10:15 pm

Meeting humidity requirements with mixed mode

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Carly Ruggieri  on 

Does anyone have any experience or guidance for documenting compliance with ASHRAE 55 with a mechanically conditioned, naturally ventilated building?

1
Fri Sep 23, 2011, 3:49 pm

Polymerized urea formaldehyde resin

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Katie Ellsworth  on 

We have laminated particleboard also known as melamine panels which states it's formaldehyde free but has polymerized urea formaldehyde resin in it. Can we still get EQ credit for it?

1
Wed Sep 7, 2011, 12:07 am

Product Takeback Programs?

NC-2009 MRc2:Construction Waste Management
posted by  Jonathan Weiss  on 

Some manufacturers have "take-back" programs where they will take back unused surplus materials and restock them - the WBDG has that listed under masonry and other spec sections.

1
Fri Oct 14, 2011, 8:29 pm

Existing Fixtures Calculated in Installed Lighting Power?

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  David Rodriguez  on 

I have a renovation project where there are three rooms in which we are not replacing the light fixtures.

1
Wed Aug 17, 2011, 2:49 pm

Tenant area commissioning

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  sompoche sirichote  on 

Our project is an office building with 10 floors on the top are leased out as a hotel tenant and we are seeking for LEED CS certified. If the mechanical and electrical plant of the hotel are separa

1
Mon Nov 21, 2011, 2:18 pm

Baseline HVAC Equip Vs. Proposed HVAC Equip

NC-2009 EAc1:Optimize Energy Performance
posted by  Greengrade User  on 

Question: Does the HVAC system for the baseline have to be the same type as the proposed design HVAC equipment? (ie.

1
Thu Sep 8, 2011, 2:42 pm

Asphalt Roll Roof Recycling

CI-2009 MRc2:Construction Waste Management
posted by  Sabrina B  on 

I am working on a existing building renovation. The existing roof, which will be demo'd, is asphalt roll with batt insulation underneath.

1
Tue Nov 8, 2011, 7:30 pm