IEQc8.1 Daylighting Spreadsheet Calculator
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Molly Jones on
We are working on a project using the May 2011 version of the daylighting and views spreadsheet. We are using excel 2007 with macros enabled.
City Supplied Reclaimed Water
EBOM-2009 WEc3:Water Efficient Landscapingposted by Nicholas Bradley on
My project site is already utilizing reclaimed water for 100% of it's irrigation, as required by the local city ordinance. Are we still eligible for this credit?
Pre-rinse spray valves
CS-2009 WEp1:Water Use Reductionposted by Tapio Peltonen on
LEED-CS 2009 form WEp1 version 4.0 states the following: "Note: The flow rate for all pre-rinse spray valves must be less than or equal to 1.6 gpm.
Applicability of ASHRAE62.1 in Major Renovation
CS-2009 IEQp1:Minimum IAQ Performanceposted by Jens Apel on
Dear all, This covers more than just ventilation but as this is the most important I put all facts and questions down here. An existing building from the 1970s is undergoing construction works.
Projected Biomass Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by Jose Salinas on
Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust.
Option 1: Full Flush-out Before Occupancy - Is there a Min. CF?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Michelle Bracewell-Musson on
With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min.?
EA Cre 3 - DES commissioning
posted by Adam Targowski on
Does anyone know how to deal with Commissioning of District Energy System (DES)?
Feedback on 0.5 gpm faucets and recirculation loops
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Susan Walter on
We're proposing 0.5 gpm faucts for a project and the client is demanding more information from other facilities on these faucets.
Protfolio Manager Analysis
EBOM-2009 EAc1:Optimize Energy Performanceposted by Paola Figueiredo, Newton Figueiredo on
We are working on projects for LEED EBO&M and have some doubts related to the credits EApre1& EAc1.
Option 3, if no whole bldg. utility meter is installed?
NC-2009 EAc5:Measurement and Verificationposted by Sebastian Graba on
How can I apply for Option 3, if my project doesn't a whole building utility meter installed? Our LEED building is located on a "campus".