Typical Design CO2 Level
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Maya Karkour on
Dear all, I understand that LEED doesn't require you to specify a maximum CO2 level for this credit.
Recycling Area - Exterior
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Mark Pappas on
We are working on a retail/office CS project (2.0) and are looking at placing the recycling outside adjacent to the dumpster area, as the interior common areas don't accommodate all tenants very we
IEQ3.2 IAQ MANAGEMENT PLAN - OPTION 2
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Jérôme Aruanno on
Hi, I am questioning about the second option, mesuring the contaminant levels. The table p 462 is indicating level to respect.
EBOM IO 2009 - SS cr 8
EBOM-2009 IOc1:Innovation in Operationsposted by Salvatore Benvenga on
1. SS cr 8 - would the addition of timers and sensors for internal light fixtures in multiple zones qualify as an IO point?
ACP
posted by Tristan Roberts on
Michael, you should not find that either of those checkboxes are required. You can sail by those areas if they don't apply to your project.
5 Year Window and ASHRAE audit v. Cx
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by Jenny Carney on
All - I always thought that they 5-year exception to the performance period rules on pg. 172 of the reference guide could likely be used for either option, commissioning or the ASHRAE Level II.
Language of Documents
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Catalina A on
Does anyone know how the documents and technical specifications of the different projects (HVAC, Electricity, Lighting, hot water, etc.) have to be presented to the GBCI in terms of language?
Recycling Area
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Paul Diaz on
I was curious if there is a rule of the thumb for determing the qualifing recyling area square footage. The credit language seems ambiguous to me.
Questions on 75%?
Pilot-Credits PC19:Whole Building Reuseposted by Heather Walters on
We are finishing up documenation on a building which is on the National Register, went through review, recieved approval from the state, and earned historic tax credits.
The lease document is not in English
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Aaron Levey on
We have a 10-year lease but it is not in English. Do we have to translate the entire document? Thank you.