FTE Calculations
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Hugh Hagues on
My project building has a number of leased spaces that will not be included in our final LEED application, however each of these spaces has full time employees who use the public restrooms and faci
"Other Non-structural Elements" covered elsewhere??
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Gail von Staden on
The project we are working on is looking to take advantage of MRc1.2 Building Reuse. However, this credit seems to only cover the basic non-structural elements - walls, floors, ceiling etc.
Scope of comissioning
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Iris Amdur on
Hello- We're working on a building that is not owner occupied and the tenant has 48 additional pieces of equipment that are not a part of the base building that are currently only being monitored
WE p1 CI and CS
CI-2009 WEc1:Water Use Reductionposted by Garrison Elder on
I am a little confused by what i have read concerning WEp1 and what fixtures are being used by a tenant vs what is in the scope. I have a CS poject where I will acheive 32% water savings.
Five year shade calculation.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by sara frye on
Apologies in advance as I know I have read the answer to my question somewhere. I just can't find it. WHEN should the five year shade calculation be performed? i.e time of day, time of year?
Is it possible to gain an ID credit by using Post Tensioning?
NC-2009 IDc1:Innovation in Designposted by Amar Colakhodzic on
I am participating in a Value Engineering (VE) exercise for a potential LEED project that is in its final stage of design.
Cleaning tissues
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Sylvia Renes on
In our project cleaning tissues will be used. It's a special cleaning agent for plastic weld joints.
Very Historic Building Project
Pilot-Credits PC19:Whole Building Reuseposted by Richard Reed on
It was very interesting to find this credit source. We are going after platinum status for the renovation of the abandoned Guam Legislature.
Exemplary Performance
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by BH . on
Hi, I would like to confirm if in point 3 of exemplary performance mean that within a distance of 3 x 42`` (typically) there will be no obstacles like glass walls, furnitures ect.
Slab on Grade F-factor for a large building
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I asked this a couple of days ago on the HAP users forum and no one has responded so hopefully I'll have better luck here.