I am a little confused by what i have read concerning WEp1 and what fixtures are being used by a tenant vs what is in the scope.
I have a CS poject where I will acheive 32% water savings. In the same building I have a CI project with one kitchen sink.
DO I USE THE BASE BUILDING WC/UR/LAV FOR MY CI CREDIT?

If yes, isn't this getting "two for the price of one"?
If no, my kitchen sink alone will not get the 20% savings. what do i do now?

any suggestions.
thanks,