I am a little confused by what i have read concerning WEp1 and what fixtures are being used by a tenant vs what is in the scope.
I have a CS poject where I will acheive 32% water savings. In the same building I have a CI project with one kitchen sink.
DO I USE THE BASE BUILDING WC/UR/LAV FOR MY CI CREDIT?
If yes, isn't this getting "two for the price of one"?
If no, my kitchen sink alone will not get the 20% savings. what do i do now?
any suggestions.
thanks,
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11477 thumbs up
November 22, 2011 - 12:34 am
Garrison, sorry for the slow response here, but I think your question should be clarified by the Water Use Reduction additional guidance doc from USGBC.