Base building fixtures meet old LEED 2.0, but not LEED CI 2009
CI-2009 WEc1:Water Use Reductionposted by Sandra Eremic on
Our project occupies (4) out of (10) floors of a building which was LEED 2.0 certified. We are attempting Silver under LEED CI 2009.
Transient fixture uses
CS-2009 WEp1:Water Use Reductionposted by Carolina Vergnano on
Hi There, I've got two projects, one is a shopping mall and the other a health clinic, but I can't figure out the uses for the respective transients.
Manufacturer's Stockpile Material
CI-2009 MRc3.1:Materials Reuseposted by Gary Keyfauver on
I work for a major precast/prestressed manufacturer. Our products are always designed, manufactured and installed for each individual project.
AGMBC 2010 - Multi-building industrial plant certification
posted by Daniel Brum on
Hi there. I am working on an industrial plant 2009 LEED-NC/AGMBC 2010 certification.
How to treat reuse furniture in the calculation for FSC wood
CI-2009 MRc7:Certified Woodposted by Steve Khouw on
In a LEED project, we want to reuse the system furniture from the existing tenancy, the desktop made of wood, but not FSC certified.
SSc3 Brownfield Documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Josh Mauldin on
Our project is the renovation of an existing building from 1955. No Phase II ESA was done, but we hired an environmental consultant to do an asbestos and lead paint survey.
Occupancy Sensors in LPD Calculations
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Jennifer Perdue on
Has anyone had experience in calculating additional reduction in LPD by incorporating a significant number of occupancy sensors in their office lighting planning?
Aquifer use
CS-2009 WEp1:Water Use Reductionposted by Gabriela Hernández Castillo on
Our project has underground water with potable quality. Will the use of this water be considered an option for reducing the potable water consumption that is supplied by municipal sources?
How to classify Hotel FTE's
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Matt Wolfe on
For Hotel project types, has anyone recently classified hotel guests as residents within the WEc1 plumbing template ? I understand the distinction between treating the guests as an FTE vs.
Reuse of building structure
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Adriana Hansen on
Hello, We are working with a major renovation in a stadium.