Forum quick links
Using as ID credit in New Construction, indoor & outdoor
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Sarah Corbitt on
I'm working on a project which is using this credit as an ID credit for LEED-NC. Must outdoor lights be included?
EAc1 required 2 points
CI-2009 EAp2:Minimum Energy Performanceposted by Jennifer Berthelot-Jelovic on
I know that for EAc1 there was a requirement that "All LEED for New Construction project registered after June 26, 2007 are required to achieve at least two (2) points." Since I am working on a LEE
LEEDuser plumbing assessment template updated
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Tristan Roberts on
To all LEEDuser members using our Water Efficiency Economic Assessment Policy for WEp1: we have made a couple minor updates to it to improve it relative
Supplemental Documents
posted by David Eldridge on
If your normal process was to generate letter size documents for the project, then I don't see why GBCI would need to have them changed to another format. Legibility and usability will be the key
Flow Regulators with Pressure Compensation
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Surenthira Stephen Ramachanderan on
Hi Dan, I m currently doing couple of LEED C&S buildings.
Design Engineer Signatory
CI-2009 EAp2:Minimum Energy Performanceposted by Sundararaj Subburaman on
Please let me know if the HVAC Designer will be representing the Design Engineer Signatory for the EA P2? If not who will be the Design Engineer - MEP designer?
Tenant Lease and Sales Agreement x Design Review
posted by WAGNER OLIVEIRA SILVA on
Normally we send documents to Design Review before the project be sold in part or entirely by the Owner.
5 star Energy Star House
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by John Kinch on
Hello again, Our facility is already a 5 star energy rated building. Is there any way to cut corners on this paperwork? Thanks!
Innovative water efficiency
EBOM-2009 IOc1:Innovation in Operationsposted by Melissa Merryweather on
A project considering LEED EBOM is looking to add a new rainwater catchment system because it will be lower-cost then replacing old sanitary ware.
Multi-parameter alternative product analysis
Pilot-Credits PC2:PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by Jeff Gearhart on
We are pursuing this credit for a CI project. Interested in any further guidance on "multi-parameter alternative product analysis".