Biomass Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by sara frye on
Our project, a small non-profit farm house renovation, is using a wood fired biomass boiler.
SLL Prerequisite 3 HELP!!!
posted by Roger Moquin on
I have a lot of trouble with that prerequisite. Our project is in Canada and there is water everywhere here!!! First, we have a little water body in border of the road near our project.
Credit 3.2, Option 1, Path 2
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Douglas Blakeslee on
We are the GC for a new small (4,000 SF) Leed Certified fast food restaurant with 3,800 CFM of outside air when occupied. We plan to do our initial 3,500 CF/SF flushout over a weekend.
Phased IAQ Testing?
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Q + on
Is it acceptable to perform air quality testing in phases? The project in question is a 175K sf school designed in 7 zones.
IAQ Testing and Furnishings
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Q + on
The Credit Language contains this statement regarding air quality testing and furnishings: "Movable furnishings such as workstations and partitions should be in place for the testing, although it
Usage and days of operation
posted by MARIO DE JESUS CARMONA VINAS on
Christopher, I have the same problem, were you able to fix it?
Supervising the Commissioning of 20% of the energy systems
NC-2009 EAc3:Enhanced Commissioningposted by Maya Karkour on
Hello, We are working on a project in which all the energy systems will be installed, tested and balanced by the general contractor.
Emission Reporting using Energy Star
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Simon Sue on
When i click on the "select view" then to Performance :GHG emission, i can see the current total GHG emission value, but when i try to generate SEP (Statement of Energy Performance) report, the GH
EAp2 Equipment Motors
CI-2009 EAp2:Minimum Energy Performanceposted by Eric Claycamp on
For a LEED CI project that includes a fitness center, do you count the motors in the treadmills and cross trainers? No fitness equipment I have found is Energy Star rated.
Commissioning process in a volume program
posted by Emmanuel Pauwels on
After reading the documentation about the LEED Volume program, I understand that it is essential to implement a quality control plan in order to ensure that the certified prototype will be implemen