Forum quick links
Definition of "residential area or neighborhood and more
Schools-2009 SSc2:Development Density and Community Connectivityposted by Kimberly Cullinane on
Our school project is located to plenty of basic services in the "downtown" area of a rural community.
Grade 2-5 Elementary School
Schools-2009 IEQc7.2:Thermal Comfort—Verificationposted by Kimberly Cullinane on
Just confirming that we are still eligible for this credit even if our project is a grade 2-5 elementary school. In our case, we would just need to survey all teachers and staff?
UPS system need to be commissioned?
NC-2009 EAc3:Enhanced Commissioningposted by Eric JS on
Hi all, UPS system is used as a back up power in case if there is power failure. In that case. UPS itself consume small amount of power.
Natural Ventilation
EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoringposted by Melissa Young on
Our building is mostly naturally ventilated. One of the seven floors, however, has a central air system installed that serves three densely occupied conference rooms.
No BAS.
EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoringposted by Melissa Young on
As it says above, achieving this credit without a BAS is difficult. What exactly needs to be done if we don't have a BAS?
Do reused Hospital beds qualify for furniture reuse credit?
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Bryan Waters on
We would like to pursue this credit, as our hospital floor renovation project registered under LEED CI v 2.0 is reusing all patient beds.
Baseline Fan Power: PFP and AHU Pressure Rises
NC-2009 EAp2:Minimum Energy Performanceposted by Rodrigo Perez on
We’re working on a 20 stories building that is seeking LEED NC v3 certification. This building considers ASHRAE’s #8 HVAC baseline system: VAV w/ PFP boxes.
Distance between buildling entrance and bicycle storage
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by William Wong on
I read from Reference Guide that there is distance requirements (200 yards from building entrance) for location selection of bicycle storage for case 1 (commerical or institutional project 300,000
LEED Automation
posted by Tristan Roberts on
Adrianna, it sounds like one more article isn't what you're looking for, but here is a good one, in case it's helpful:
Focus of Webinar
posted by Mayra Portalatin on
Tristan, do you know if this is going to be focused more on new construction, or will they discuss pitfalls in the Existing Building Arena as well?