Automatic Receptacle Control

NC-v4 EAp2: Minimum Energy Performance
posted by Jan Hesse on Aug 7, 2015, 6:36 am

ASHRAE 90.1-2010 8.4.2 states, that 50% of all 125 volt 15- and 20-Ampere receptacle outlets in private offcies, open offices and computer classrooms shall be automatically switched off when the...

Last reply: Marcus Sheffer, Mar 25, 2020, 11:58 am

LEED v4 Interior Lighting Quality Option 2, Strategy A

NC-v4 EQc6: Interior lighting
posted by Kera Lagios on Jul 15, 2016, 6:27 pm

So far, we have not found a direct only fixture that meets this criteria. If anyone does find one, let the forum know! The best way around this is to use direct/indirect lighting or indirect only...

Last reply: Catalyst Partners, Sep 30, 2019, 5:10 pm

LEED CI V4 Energy Model, 2 Floors

CI-v4 EAp2: Minimum Energy Performance
posted by SSN Energy Model on Sep 13, 2017, 2:02 pm

Hi,
I am doing the energy simulation for LEED CI v4 Rating. There are 5 buildings named as Block 1,2,3,4&5 in the site and all buildings are conditioned by the centralized air cooled...

Last reply: Jonathan Weiss, Jun 24, 2020, 9:26 am

Non-certified buildings in LEED boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by MERVE AYGENC on Jan 10, 2018, 7:01 am

Hi everyone,

The project area has two main buildings that just one of them will apply for LEED v 2009 - NC certification. They are totally separate buildings in terms of air-conditioning...

Last reply: Laura strauss, Sep 3, 2019, 5:16 pm

Timing of Installation and Commissioning

NC-v4 EAc5: Renewable energy production
posted by Michaella Wittmann on Jan 29, 2018, 11:22 am

The LEED Credit template for this credit indicates that the renewable installation has to be complete and commissioned prior to building occupancy. Are any exceptions made to this if the...

Last reply: Deborah Lucking, Dec 9, 2019, 2:16 pm

Recommened software for doing the Interior and Daylighting analyses.

NC-v4 EQc7: Daylight
posted by Jorng-ren Chern on Apr 10, 2018, 2:05 am

in the Forum.  Default Revit materials are a very good start, but when you want to define very specific glazing performance, please refer to the Forum post here: https://forums.autodesk.com/t5/lighting-solar-analysis-forum/critical-up... Log in or register to post comments Zahra Mirian LEEDuser Basic Member July 24, 2019- 4:53 pm Thanks for your response David, I have the latest version of Insight on my Revit 2019. I have cleaned up...

Last reply: hj hjh, Jan 4, 2022, 7:29 am

Quality Views in Non-Regularly Occupied Spaces

Pilot-Credits EQpc117: Quality views in nonregularly occupied spaces
posted by Allison Wilson on Mar 15, 2019, 1:23 pm

In completing the pilot credit survey, I thought the item re: requiring this credit as a prerequisite was interesting. I don't know that this pilot credit would make sense as a prereq, but what...

Last reply: SIG - Sustainability Main Account, Mar 25, 2021, 3:40 pm

Any reason NOT to switch from v4 to v4.1 for the BPDO EPD credit?

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Renee Shirey on Jul 12, 2019, 9:59 am

I looked at the changes, and I don't see a reason why the switch to v4.1 would not be of benefit.  Am I missing anything, where it could potentially create a problem for a project?

Last reply: Summer Minchew, Jul 23, 2020, 3:34 pm

Stairwell Lighting zone

NC-v4 EAp2: Minimum Energy Performance
posted by Agnieszka Rylska on Jan 28, 2020, 8:21 am

According to ASHRAE 90.1, section 9.4.1.6 „g. Stairwell Lighting – Lighting in stairwells shall have one or more control devices to automaticcly reduce lighting power in any one controlled zone...

Last reply: Marcus Sheffer, Oct 12, 2022, 11:15 am

INpc155- Design for Indoor Air Quality and Infection Control

CS-v4 INc1: Innovation
posted by Sustainability & Commissioning on Apr 25, 2023, 2:10 pm

Hi all, 

The Pilot Credit: Design for...

Last reply: Deborah Lucking, Sep 26, 2024, 5:24 pm