Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Utility Trenches Part of Project Boundary?

NC-2009 PIf4:Schedule and Overview Documents
posted by  Larry Turbes  on 

We're certifying a school addition and the site area associated is fairly straight forward except we have both power and sanitary utility connections that finger out beyond what would be a reasonab

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Sep 7, 2017, 9:28 pm

Energy Star appliances in LEED v4

NC-v4 EAc2:Optimize energy performance
posted by  Eesmyal Santos-Brault  on 

Is there a CIR on modeling energy star appliances in LEED v4? Can we claim energy savings for using energy star appliances in LEED v4?

1
Sat Sep 9, 2017, 5:39 pm

Whether to include water on a roof in this calculation

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Sara Greenwood  on 

I have a project that has reflecting pools on part of the roof area and do not see any precedent for this in LEED User.

1
Thu Sep 7, 2017, 5:46 pm

Concrete & rubble excavated from previous demo

NC-2009 MRc2:Construction Waste Management
posted by  Alara Brinton  on 

Our project is located on a site where an existing building was demolished a few years back.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Sep 7, 2017, 4:54 pm

MInisplit Units

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Paula Hernandez  on 

Hi, I would like to know if minisplit (non-ducted) units have to comply with Standard 62.1-2010, Section  5.8, "...p0articulate filters or air cleaners with a minimum efficiency reporting valu

0

Building Envelope CxA

NC-v4 EAc1:Enhanced commissioning
posted by  Eesmyal Santos-Brault  on 

Can the envelope consultant of a project also provide Building Envelope commissioning services?

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Sep 7, 2017, 3:54 pm
0

Pilot credit wakable site

CS-v4 INc1:Innovation
posted by  Tobias Berge  on 

We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit.

1
Sat Sep 9, 2017, 7:04 am

V2. LEED Recertification

LEED Recertification: When and How
posted by  Jason Zielsdorf  on 

I have a project that recieved LEED BD+C: New Construction v2 - LEED 2.2 in 2014. They recieved a credit for water reduction with low flow toilets. 

1
Mon Apr 30, 2018, 11:27 pm