Visitor parking only

CI-v4 LTc5:Reduced parking footprint
posted by  Karen Elliott  on 

We have an large office space in Central London that has 2 car parking spaces, but the staff will not be able to use them.  They will only be used in exceptional circumstances for visitors.

1
Fri Sep 15, 2017, 9:43 pm

electric bicycles can comply with Green vehicles

NC-v4 LTc8:Green vehicles
posted by  Hanh Truong  on 

Dear all,

My question is that whether electric bicycles can be considered as Green vehicles or not?

0

East-West Rout

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Jalal Avades  on 

If our project is within a quarter mile of two bus stops. The two routes have the same route number but one goes East-West and the other is across the street and travels West-East.

6
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Thu Sep 14, 2017, 9:59 pm

Plaster and flat / non-flat and parking garage

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Marco Abdallah  on 

What is the reason for an distinction between non-flat (textured) and flat paints? Plaster has to be seen as coatings? What about underground parking lots, do they count as interior space (on the o

4
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Thu Sep 14, 2017, 7:42 pm

Doctor Room

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Dinesh V  on 

What is the Category of Doctor Room as per ASHRAE 62.1.2007 Space classifications ? 

2
Thu Sep 14, 2017, 10:38 am

U value requirement for " Roof Hatch"

NC-2009 EAp2:Minimum Energy Performance
posted by   Faisal   on 

Hi...

    Does the proposed or basleine U or SHGC value requirement for the ROOF construction would also be applicable of " Roof Hatch"?

 

1
Thu Sep 14, 2017, 2:19 pm

Cx completion and LEED submissions

CI-v4 EAc1:Enhanced commissioning
posted by  Erin Rowe  on 

Two questions. 1) We are going for all commissioning points on a LEED V4 CI project.

0

Cx completion and LEED submissions

CI-v4 EAc1:Enhanced commissioning
posted by  Erin Rowe  on 

Two questions. 1) We are going for all commissioning points on a LEED V4 CI project.

1
Thu Sep 21, 2017, 6:18 pm

Change to Cx agent

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Cindy Quinn  on 

I'm working on a v4 project currently in CD design phase.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Sep 14, 2017, 1:13 am

Option 2. Third-Party Utility Reporting (1 point)

Homes-v4 EAc5:HVAC Start-Up Credentialing
posted by  Robert Grimard  on 

 

Hi,

I'll soon be the proud owner of a small house in Quebec, Canada and I need clarification on this Option 2 of th Advanced utility tracking. It says:

0