Forum quick links
Can multiple teams of two in-house staff perform the audit?
EBOM-v4 EQc6:Green cleaning - custodial effectiveness assessmentposted by Marc Mondor on
Our building contains a few million square feet, and while the APPA audit may be time consuming for a building of this size, we believe that it is worthwhile to pursue as part of our EBO
Rainwater Management GI
NC-v4 SSc4:Rainwater managementposted by Jamé Wills on
Is Exfiltration Trench/French Drains a Green Infrastructure Method?
Certifying 2 separate interior spaces in 2 separate buildings as 1 Certification
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Oliver Bate on
I have 1 CI project which is taking place in 2 adjacent buildings (Europe).
LEED ARC project type selection
posted by Subrota Roy on
Hi,
Direction of transit trips
ND-v2009 NPDc8:Transportation demand managementposted by MAUDE PINTAL on
Hi,
When I calculate the daily trips of bus lines, do I need to add the numbers of trips, for example east + west ? considering that each direction is at a different bus stop.
LEEDCoach Response to ITE questions
CI-v4 LTc5:Reduced parking footprintposted by emily reese moody on
Hi all,
I posed the following questions to LEEDCoach, and got the responses below.
Secure Facilities
Schools-NC-v4 SSc8:Joint use of facilitiesposted by Lisa Logan on
Is it no longer a requirement to lock down parts of the building in order to meet this credit?
Is inputting meters in the Whole Building model a MBCx requirement?
NC-v4 EAc1:Enhanced commissioningposted by Lise Dannesboe on
Hi.
Running Exhaust Into Energy Recovery Wheel
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Neil Sen on
Are we allowed to run exhaust from areas like trash rooms into an energy recovery wheel and still achieve this credit?
Rainwater Management through BMP
NC-v4 SSc4:Rainwater managementposted by Jamé Wills on
I have an 8 acre site that is largely buildings and roadway, is it possible to achieve this credit with the use of French drain (exfiltration trenches)?