Topic | Recent |
---|---|
Life Support Systems factored in to EAp2 or EAc1?NC-2009 EAp2: Minimum Energy Performanceposted by Lance Collins on Sep 23, 2010, 4:14 pm
How should projects that feature life-support systems for medical purposes account for their energy loads to comply with the prerequisite? These are 24/7 systems that also require redundancy so... Last reply: Marcus Sheffer, Sep 24, 2010, 1:49 pm |
|
Anti-termite TreatmentNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Keerthi Ratnayake on Sep 24, 2010, 12:49 pm
Is there any ruling in LEED related to this activity which generally happens once the sub-... Last reply: Allison Beer McKenzie, Sep 24, 2010, 1:54 pm |
|
Glare Control for CS projectCS-2009 IEQc8.1: Daylight and views - daylightposted by Michelle Raigosa on Sep 18, 2010, 9:34 pm
Has anyone had any luck requiring the tenant to provide interior shading devices (interior blinds or shades) in order to achieve this requirement of the credit? I have a... Last reply: Eddy Santosa, Sep 24, 2010, 6:24 pm |
|
Heat Recovery in Baseline ModelNC-2009 EAc1: Optimize Energy Performanceposted by V. Miller on Sep 23, 2010, 6:18 am
Does anyone know what the official line is on baseline heat recovery is for constant volume HVAC systems with more than 5000cfm? ASHRAE 90.1 G3.1.2.10 Exhaust Air Energy Recovery states... Last reply: Michael Tillou, Sep 27, 2010, 10:12 pm |
|
Packaged terminal heat pumpsNC-2009 EAc1: Optimize Energy Performanceposted by V. Miller on Sep 23, 2010, 3:45 am
Does anybody know why the baseline COP's for Packaged Terminal HVAC equipment (HVAC systems 1-2 for residential) are less for larger capacities and lower for smaller capacities i.e. Using the... Last reply: Michael Tillou, Sep 27, 2010, 10:28 pm |
|
Runoff volumesNC-2009 SSc6.1: Stormwater design - quantity controlposted by Gregory Hurst on Sep 21, 2009, 6:50 pm
The key for volume calculation is knowing the 1 and 2-year, 24 hour storm depth. This is calculated fordifferent locations and it is a long process and it is not the same as calculating runoff... Last reply: Jean Marais, Sep 28, 2010, 2:53 am |
|
Interior lighting for residential projectNC-2009 SSc8: Light Pollution Reductionposted by Deborah Spira on Sep 28, 2010, 8:22 am
Hi all, I am working on a residential multi-dwelling building. For a residential building it is impossible to control or decide the interior lighting for the apartments. Is this credit therefore... |
|
How do you calculate Transient visitors?CS-2009 WEc3: Water Use Reductionposted by Kathy Caswell on Sep 28, 2010, 7:58 am
I can not figure out how to calculate this for a core and shell office building that is 3/4 leased. Last reply: Tristan Roberts, Sep 28, 2010, 8:25 am |
|
Transfer data to LEED online?Schools-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Nicole Cavanaugh on Sep 28, 2010, 10:28 am
How do we go about transferring the data from the provided LEED template to the online form? (Assuming there is an easier way than re-entering all the info? ) Thanks for your help! Last reply: Tristan Roberts, Sep 28, 2010, 10:56 am |
|
Table Flush Fixture Data and Flow Fixture DataNC-2009 WEp1: Water Use Reductionposted by Rob Hink on Aug 30, 2010, 2:36 pm
Under the Fixture Group Column; What goes is supposed to be typed in the 'Select' Column? Last reply: Erica Downs, Sep 28, 2010, 2:30 pm |