Minimum Energy Performance and moduline units
CI-v4 EAp2:Minimum energy performanceposted by Scott Harbaugh on
The facility in which we are designing a 20,000+ square foot office space project is served by the old Carrier moduline units. Is it possible to get EQ prerequisite Minimmum Energy Performanc
Roof for rent
posted by Vu Duc Huy on
Out client has a situation like that: They want to build a building and then for tenant rent the roof ( the concrete roof without any complement.
Architectural Design Guideline for LEED platinum Project under CORE & SHEEL V4
NC-v4 MPR1:Must be in a permanent location on existing landposted by Subrota Roy on
Hi,
We are going to start Architectural drawing design of one project. ( Project targeted rating level PLATINUM Under CORE & SHEEL V4)
Project data as follows :
Perimeter controls for urban projects
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Max Zayika on
What are the most widely used types of perimter sediment controls for urban projects (with existing hard site paving)?
greenroofs soils
NC-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
Office Building with Data Center
NC-2009 EAc1:Optimize Energy Performanceposted by Lise Dannesboe on
I have a possible case with a office building that also contains a large Data Center.
green wall
CS-2009 IDc1:Innovation in Designposted by Daniela Castro Salgado on
I'm sure I read somewhere that including green walls in the project can help us earn an Innovation in Design point if it complies with a certain percetange of the building's footprint area.
Requirement of entryway system
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Yan-Chuan Chen on
I am currently working on a residential building. For LEED V2009, the requirement of the permanent entryway system should have 3m long in the primary direction of travel.
Shell with no energy or metering systems
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Martin Meehan on
Hello
My project is to be a shell with no HVAC, lighting or metering systems. It is understood that there will be one tenant for the building.