Minimum Energy Performance and moduline units

CI-v4 EAp2:Minimum energy performance
posted by  Scott Harbaugh  on 

The facility in which we are designing a 20,000+ square foot office space project is served by the old Carrier moduline units.  Is it possible to get EQ prerequisite Minimmum Energy Performanc

1
Tue Nov 28, 2017, 4:55 pm

Roof for rent

LEED Canada Forum
posted by  Vu Duc Huy  on 

Out client has a situation like that: They want to build a building and then for tenant rent the roof ( the concrete roof without any complement.

1
Tue Dec 5, 2017, 3:31 pm

Architectural Design Guideline for LEED platinum Project under CORE & SHEEL V4

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Subrota Roy  on 

Hi,

We are going to start Architectural drawing design of one project. ( Project targeted rating level PLATINUM Under CORE & SHEEL V4)

Project data as follows :

1
Mon Oct 15, 2018, 7:43 pm

Perimeter controls for urban projects

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Max Zayika  on 

What are the most widely used types of perimter sediment controls for urban projects (with existing hard site paving)?

0
1
Tue Nov 28, 2017, 4:28 pm
1
Fri Feb 23, 2018, 6:16 pm

Office Building with Data Center

NC-2009 EAc1:Optimize Energy Performance
posted by  Lise Dannesboe  on 

I have a possible case with a office building that also contains a large Data Center.

5
Delta Electronics
LEEDuser Basic Member
0 thumbs up
Mon Nov 27, 2017, 2:36 pm

green wall

CS-2009 IDc1:Innovation in Design
posted by  Daniela Castro Salgado  on 

I'm sure I read somewhere that including green walls in the project can help us earn an Innovation in Design point if it complies with a certain percetange of the building's footprint area.

3
Sun Nov 26, 2017, 6:30 pm

Requirement of entryway system

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Yan-Chuan Chen  on 

I am currently working on a residential building. For LEED V2009, the requirement of the permanent entryway system should have 3m long in the primary direction of travel.

1
Thu Apr 26, 2018, 10:25 pm

Shell with no energy or metering systems

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Martin Meehan  on 

Hello

My project is to be a shell with no HVAC, lighting or metering systems. It is understood that there will be one tenant for the building.

1
Fri Nov 24, 2017, 5:54 pm