Forum quick links
invitation to Carbon Sync call #4 - Wednesday 12/20
posted by Stephen Endy on
Following the summer SDL summit - we formed a spinoff user group called "Carbon Sync" to discuss Life Cycle and Carbon Assessment tools like Tally and Athena. We've had three successful
O+M Starter Kit for CI
CI-v4 INc1:Innovationposted by Kristen Magnuson on
Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.
EU Standards vs LEED
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Tanja Arnesson on
EU Standards vs LEED We have some problem with the VOC (g/l) content in our products.
Service Sink Baseline flow
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Jorge Torres-Coto on
I have a project that includes mainly Vocational Classrooms. As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta
Pipe insulation sealant???
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Edgar Arevalo on
I'm trying to figure out, under what category would pipe insulation joint sealant fall under?
Retail -Clarifying Reference Guide language indicating "14 days"
Retail-CI-v4 EQc4:Indoor air quality assessmentposted by Stacey Olson on
The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.
Using Default Roof Material SRI values
NC-v4 SSc5:Heat island reductionposted by Lauren Sparandara on
Hello - I noticed that there are default SRI values available for use for the ground SRI values through CIR #10411 - just as was done for LEED 2009 - are there some default values that can be
Finding and using the new Wiggio "BuildingGreen Community"
posted by Nadav Malin on
Hi folks,