I have a project that includes mainly Vocational Classrooms. As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Metal, Plumbing).
I am trying to figure out if what flow to utilize as a baseline, either 0.50 / 1.50 / 2.20 gpm
Thanks
Jorge
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.