Forum quick links
LEED - EBOM Data center
EBOM-v4 MPR3:Must comply with project size requirementsposted by SAMY Chamy on
Dear Concern:-
Existing Data centre MPR Enquiry
Switching from Appendix A to Table 6-3 to calculate Ev
CI-2009 IEQp1:Minimum IAQ Performanceposted by Edgar Arevalo on
I am using an old 62MZ calculator file to do comply with the IEQp1 prerequisite. However, after adjusting the ventilation rates for peak heating mode, Ev cannot be calculated on the spreadshe
Variable Kitchen Exhaust
Retail-NC-v2009 EAp2:Minimum energy performanceposted by Nick Dalton on
This project will include kitchen hoods with temperature sensors used to control the volume of exhaust air.
Elevators
NC-v4 EAc2:Optimize energy performanceposted by John McCullough on
I have managed to create a rather impressive energy reduction between the baseline and proposed elevators.
Performance check for each building in a district cooling system
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by Nuttanee Vongveeranonchai on
Hi all,
Paints and Coating
CS-2009 MRc4:Recycled Contentposted by Edgar Arevalo on
I've been searching through the reference guide but I cannot find a direct answer. My question is, can we also catalog paints and coatings into the Materials and Resources Calculator?&nb
Adobe Acrobat / Reader DC vs LEED Online
posted by Steven Wheeler on
It should not be a surprise to any LEED person that the new Adobe DC does not work with LEED-online. In IE11 the the system requirements say Adobe Reader not found.
Paint and coating
CS-2009 MRc4:Recycled Contentposted by Edgar Arevalo on
I've been searching through the reference guide but I cannot find a direct answer. My question is, can we also catalog paints and coatings into the Materials and Resources Calculator?&nb
LEED Certification: Cities & Communities
posted by JOSE MANUEL DIAZ SARACHAGA on
Hi, How could I get further information related to LEED Cities & Communities?. Regards
Dedicated Smoking area for Group Building with distance less than 25 ft
NC-v4 EQp2:Environmental tobacco smoke controlposted by Ashraf Ali Khan Khan on
We are currently working on NC V4 Group buildings. Project is G+2 with total of 100 buildings and distance between the buildings are less than 25 feet.