Forum quick links
ETS Blower Door Test- Suite Preparation
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Mohammad Fakoor on
Hello Everyone,
Retrofit of a existing building into green building
EBOM-2009 WEc1:Water Performance Measurementposted by Mohammed Ibrahim on
Storm water from neighboring site
NC-v4 SSc4:Rainwater managementposted by Bradley Magnusson on
The project I am working on is in a campus setting and the neighboring site's excess runoff is discharged into a storm drain pipe that runs through our project's
NC-v4 SSc2 - Site development - protect or restore habitat
NC-v4 SSc2:Site development - protect or restore habitatposted by Mar Mulero on
Hello :an outside area of land with vegetation, but where lighting has been installed and dirt roads have been formed, long time ago, it can be considered a greenfield area or previously disturbed?
Production plant - LEED system selection
posted by Agnieszka Rylska on
What is the most appropriate LEED system for a new production plant? Can we register the project under LEED for Warehouses and Distribution Centers?
Threat Factor Calculation
Pilot-Credits SSpc55:Bird collision deterrenceposted by Francesco Passerini on
Hi I've been working on a project where I want to purse this pilot credit.
Monitoring-based commissioning
NC-v4 EAc1:Enhanced commissioningposted by Paula Rantanen on
In our project building, we have many measurement points that do not measure energy consumption directly but the energy consumption can be reliably calculated from the tracked data and the building
Which flow rates to use?
NC-v4 WEp2:Indoor water use reductionposted by Nate Tsang on
Hi all, The prerequisite lists the baseline flow rates at 60psi (415 kPa). Does this mean that the proposed flow rate must also be at 60psi?