WS 2018--Resilience & RELi
posted by Nadav Malin on
- Does having a rating system change the conversation?
- How well defined are the metrics for resilience?
- How to measure success?
- Does the RELi Rating System provid
Principal Heating source
NC-2009 EAc1:Optimize Energy Performanceposted by Rahula Attalage on
Dear All,
C&S office now with Upgraded Core and Shell Services in Tenancies
CS-v4 EAp2:Minimum energy performanceposted by James Duggan on
Hi, I'm working on an office C&S project. Up until recently the MEP strategy was natural ventilation of all tenancies and for this reason the tenancy was envisaged to be modelled that way
Campus setting, trespass boundary criteria clarified?
NC-v4 SSc6:Light pollution reductionposted by Vince Briones on
The V4 BD+C reference guide notes "When additional properties owned by the same entity responsible for the LEED project are contiguous to the project site and have the same or a higher lighting zon
Safety Data Sheet as manufacturer's inventory
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Nativa Architecture on
Dear All,
Long term bike storage in a multi-family residential building.
NC-v4 LTc6:Bicycle facilitiesposted by Susan Di Giulio on
Hi,
Can furniture be included?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hi everyone,
it sounds like a silly question, but can furniture be included for MR BPDO - Material Ingredients Option 1?
Enhanced Commissioning with a DES
NC-v4 EAc1:Enhanced commissioningposted by Deborah Lucking on
All - looking for clarification to this para from the v4 BD+C Reference Manual (page 401):
Not sure what we can do with this credit
EBOM-v4 SSc6:Site improvement planposted by Meier Corporate Account on
Our facility was constructed in the center of 96 acres of asphalt. The area had been asphalt for well over 20 years before this.
Submetering water
CS-2009 IDc1:Innovation in Designposted by Marina Andrade on
Hello, Can I attempt for Inovation in Design for an office building project that is pursuing LEED for CSv.e by installing individual water submeters for each tenant? Thanks in advance