Forum quick links
Building Addition Energy Metering
NC-v4 EAp3:Building-level energy meteringposted by Mark Zoeteman on
Proposed LEED project involves only a building addition in a campus setting where portion is served by new mechanical equipment and portion by existing building mechanical equipment.
Incorrect FGI reference
Healthcare-v4.1 EQc9:Acoustic Performanceposted by John McFarland on
For Option 1, the credit requirement refers to Section 1.2-5.1.6 and Section 1.2-5.1.6.2 in 2018 FGI Guidelines for Design & Construction of Hospitals.
MER Waterproofing
NC-v4 EQc2:Low emitting materialsposted by Adam Yarnell on
Hi, I've had to vet mechanical room floors and waterproofing coatings for a few projects, and I've had a hard time finding products that have undergone a general emissions evaluation.
NC - v4 MRc2 thru MRc4 as they relate to site work and divisions 31 and 32
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Louis Harris on
We are looking for direction and help in finding LEED qualifying credits in division 31 and 32.
Swimming Pool
NC-v4 WEp2:Indoor water use reductionposted by Penny Cole on
We are certifying a Rec Centre that includes an indoor pool, in addition to a couple of gym spaces. Does the pool water use need to be included in the indoor water use prerequisite and credit?
Calcium silicate adhesive and PVC jacket adhesive
NC-v4 EQc2:Low emitting materialsposted by Mark Meaders on
We have a project in which we are looking for calcium silicate adhesive and PVC jacket adhesive for mechanical/ plumbing use that comply with the VOC requirements AND CDPH testing require
Can COMcheck be used for EAc2 compliance ?
NC-v4 EAc2:Optimize energy performanceposted by Aditya Potipireddi on
Hello All,
Using Credits from Rating System Other than LEED as ID Credits
NC-v4 INc1:Innovationposted by Kathleen Gaffney on
I tried to find whether or not this question had been asked on the LEED v3 or LEED v4 comment thread but nothing seemed to rise to the surface.
"20 Different permanently installed products"
NC-v4.1 MRc2:Environmental Product Declarationsposted by James Keohane on
Question about how to apply the requirement for "20 different pemanently installed products"? Can I for example use more than one paint type from Sherwin Williams? Pushing the thought f
Occupant Comfort Survey and Students
Schools-NC-v4 INc1:Innovationposted by Bryna Dunn on
In v4, the innovation credit language states: "The responses must be collected from a representative sample of building occupants making up at least 30% of the total occupants." In past versi