Forum quick links
Drywall Compound
NC-v4.1 EQc2:Low-Emitting Materialsposted by Catherine Blakemore on
Under what category does dryway compound fall for Low-Emitting materials?
View Factor 3
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by James Bell on
I have seen several references to View Factor 3 and cannot find any definition.
Fundamental Commissioning of On-Site Solar Array
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rachel Williams on
I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.
Option 3 - Product Manufacturer Supply Chain Optimization
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Edgar Arevalo on
Has anyone been able to tackle the third option for this credit, which is not shown in the BPDO calculator?
PM-10 Testing
NC-v4 EQc4:Indoor air quality assessmentposted by Robert Cashins on
What method of testing have people used to measure airborne PM-10 dust required as part of V4 IEQ Credit 3.2?
Is real time monitoring acceptable?
No Zone 2, Factor Zone 1 BCTR by 2/3?
Pilot-Credits SSpc55:Bird collision deterrenceposted by Heather DeGrella on
I am editing this question to hopefully make it more clear. Our project is hoping to achieve Bird Collision Deterrence. We have a question on the spreadsheet calculations.
Furniture to include in LEM documentation?
NC-v4 EQc2:Low emitting materialsposted by Erica Downs on
Under v3, only systems furniture and desk/occasional seating were included. Under v4/4.1, is ALL (non-permantly installed) furniture now included? What counts as a piece of furniture?
WE Credit 4 requirement question
Healthcare-v4 WEc4:Water meteringposted by Nate Maniktala on
WE credit 4 Water Metering, requires the following. However our building has at most two of the items on the list and the credit requires five.
Non-certified buildings in LEED boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by marty seese on
I have a project that is all new construction. There are 3 buildings on the site. The main building which is what the owner wants to be LEED Certified. Another building is a shed building.