Commercial refrigeration systems but not a store
EBOM-v4.1 EAc1:Enhanced Refrigerant Managementposted by Summer Minchew on
I have an O+M project considering Option 2.
Commissioning on C&S building not complete because of push back
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Edgar Arevalo on
My team is having an issue with the mechanical contractor who installed lab exhaust fans in the buildings. The commissioning agent was suppose to test those fans but the mechanical contractor
v4.1, and Photovoltaic VE
NC-v4.1 EAc2:Optimize Energy Performanceposted by on
We are working on a warehouse in Sunnyvale, CA. We are confused with the results from the spreadsheet (v3), since we investigated removing the PV array, as a VE measure. Site Energy, Co
v4.1 & Photovoltaics VE
Warehouses-NC-v4.1 EAc2:Optimize Energy Performanceposted by on
We are working on a warehouse in Sunnyvale, CA. We are confused with the results from the spreadsheet (v3), since we investigated removing the PV array, as a VE measure. Site Energy, Co
Innovation: WELL Features
NC-v4 INc1:Innovationposted by Laura Charlier on
This innovation only references WELL v1 features for achiement. Since WELL v2 has been released, has any project submitted any WELL v2 features in place of the WELL v1 features listed in the
Indoor Water Use Reduction Calculator for Hotels
NC-v4 WEp2:Indoor water use reductionposted by on
I am working on a 5 story hotel in San Jose, California. I'm trying to finalize the Indoor Water Use Reduction Calculator. The water closets (4 types) have identical gpf rates, so
Under slab insulation required on raised heated (radiant) floor slabs?
Healthcare-v4 EAp2:Minimum energy performanceposted by Deb Favaretto on
Our project is pursuing LEED BD+C for Healthcare v4. Under the Minimum Energy Performance prereq, it is stated that the building must comply with the mandatory provisions of ASHRAE 90.1 2010.
Wet-applied Lubricants
NC-v4 EQc2:Low emitting materialsposted by Megan White on
Our project is looking at the "Never-Seez NS-160 Regular Grade Compounds" which is wet-applied onsite within the weatherproofing membrane.
Innovation: Design for active occupants
NC-v4 INc1:Innovationposted by Jay R on
Is it mandatory to answer the "Additional Questions" noted in the credit description, or is that optional?
Number of Floors in Project Space, or Building?
Pilot-Credits EQpc117:Quality views in nonregularly occupied spacesposted by JLL Sustainability Consulting on
The percentage floor area required to have quality views is dependent on the number of floors in the building. For a CI project, do we count only the number of floors associated with the proj