Forum quick links
Insulation in Interior walls for Vault Spaces in Data Center
NC-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi Everyone,
Regional Priority credit for an L&T credit
CI-v4 LTc1:LEED for neighborhood development locationposted by Cindy Quinn on
Our project is located in an ND Gold certified neighborhood. If we pursue the LEED for ND location credit in leiu of other L&T credits, how can we receive a Regional Priority point for Ac
CSR Sample
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Edgar Arevalo on
I'm reviewing shop drawings for LEED info. The contractor provides a sample of the BPDO calculator filled out with data that is suppose to reflect information from the documents attached
v4.1 Low-Emitting Calculator??
NC-v4.1 EQc2:Low-Emitting Materialsposted by Sara Greenwood on
Does anyone have access to a v4.1 low-emitting calculator? Since some categories are now quantified by cost, volume, or square footage it warrants a different calculator.
What equipment does "Discharge water temperature tempering" pertain to?
NC-v4 WEp2:Indoor water use reductionposted by Glen Boldt on
We are working on a hotel project.
Thermal Comfort control
NC-v4 EQc5:Thermal comfortposted by Gail Napell on
has anyone achieved this credit through Comfy or a similar ap?
EQpc123- Designing with Nature, Biophilic Design for the Indoor Environment
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Sarah Linke on
We pursued the Pilot credit Designing with Nature, Biophilic Design for the Indoor Environment on a new elementary school and were able to highlight all of the natural elements and focus on how tho
Temperature Sensor
CI-v4 EQc5:Thermal comfortposted by Edgar Arevalo on
I have a dilemma for a library project i'm working on. It seems the MEP designer added temperature sensors (wall or ceiling mounted) in the reading areas. These don't have any way to ad
Water metering v4.0 Janitor's closet water usage
CS-v4 WEc4:Water meteringposted by Alicia Ravetto on
Reviewer wrote: "Provide narrative confirming that the janitor's closet water usage has not been addressed within the metering capacity and that at least 80% of the indoor plumbing fixtures and fit
Project Size Requirements
Homes-v4 MPR3:Must comply with project size requirementsposted by LeeAnn Sendra on
I am an Architect and doing my first LEED Certification Project for my Firm. I am a bit nervous and embarassed that none of the engineers on this new Home are LEED Acredited.