Forum quick links
Leed AP Exam
posted by brazer bozlak on
Does anybody have good suggestions and tips for studying for the LEED AP BD+C exam.
new floor in existing building envelope
NC-2009 PIf2:Project Summary Detailsposted by KIMBERLY KRAFT on
Hello LEEDUsers, We are submitting a project for LEED NC v.2009 - major renovation and new construction.
AP Certification on v2009
CI-2009 IDc2:LEED Accredited Professionalposted by Paul Duva on
I am working on a v2009 LEED project and am the currently the LEED AP on the project for our IDc2 credit. I originally had a LEED AP & a LEED BD+C, however my BD+C has expired.
Dorm Suite Ventilation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by BAOQUY VU on
Our project is a large high rise dorm consisting of 4-person suites arranged typically as a 2BR and two 1BR's connected by a short inner hallway.
Modeling additions and alterations
NC-2009 EAp2:Minimum energy performanceposted by Cory Duggin on
Table G3.1 section 2 a says one of the requirements to exclude parts from the model is that "Work to be performed in excluded parts of the building shall meet the requirements of Sections 5-10."
Help modeling heating only building
NC-2009 EAc1:Optimize energy performanceposted by Logan Dorrell on
We are modeling a building in EnergyPro that is heating only, with radiant heating panels and ventilation thru DOAS.
Green Cleaning in a Semiconductor Fab???
EBOM-2009 IEQc3.1:Green cleaning - high performance green cleaning programposted by David Gibney on
I posed this question for a NC-2009 project a week ago and received no replies, so thought I'd re-post it here: I'm working on a semiconductor fab that is part of a LEED campus project.
50% or Residents and Buildings with Access
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Sara Zoumbaris on
My question is in regards to the 50% requirement of residents and the # of weekday trips.
Bus Stops Planned, Not Yet Built
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Sara Zoumbaris on
I am hoping someone can confirm for me whether planned bus stops which are not yet official/ in place but are guaranteed, may be included for credit achievement?
How to deal with a hotel.
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Susan Di Giulio on
Others have asked this before and not gotten an answer so I'm taking another shot. Can someone please verify this approach?